Mosier Water System Improvements

MOSIER WATER SYSTEM IMPROVEMENTS

PHASE 1 – EASTSIDE BPS / PHASE 2 – EMERGENCY SUPPLY WELL

PROBLEM: The City of Mosier’s water system is vulnerable to the failure of its water supply system. The existing Eastside Booster Pump Station (BPS) is obsolete and has exceeded its design life. Failure of this pump station will result in a water outage to all of eastside Mosier. The City has one well (Well No. 4). A backup well is needed in the event Well No. 4 fails. Without a backup well, the City will quickly suffer from a water outage if Well No. 4 fails.

SOLUTION: A new well and a new BPS – In 2019 the City acquired a $1.4 million loan/grant from USDA to build a new well and a new BPS. The BPS will break ground in August 2021. The new well construction is scheduled for the summer of 2022.

COST: $1.6 MILLIOn
USDA AWARD: $1.5 MILLION
CONSTRUCTION: 2021 – 202

CONTACT: MOSIER CITY HALL
(541) 478.3505

mosiercityhall@cityofmosier.com

 

Cambiar a Español

CITY OF MOSIER​

PO Box 456
208 Washington St, Mosier, OR 97040
Phone: 877-319-8467 / 541-478-3505
Fax: 877-553-3601 / 541-478-3810 help@cityofmosier.com
Public hours: M-Th, 10 am – 2 pm

City of Mosier on Facebook

City of Mosier

1 day 14 hours ago

Here are some important upcoming event dates this spring.

City of Mosier

2 days 8 hours ago

Are you ready for some Spring Whiplash Weather? This weekend, temperatures may struggle to hit 50° as a major storm brings significant rain. But the